Construction of a new transit center facility, including a 7,500 SF terminal building and 22 service bus bays. The terminal building includes a computerized dispatch center, meeting rooms, breakroom, and public restrooms. Other scope includes hardscape, multi-colored DG, a 50 foot high Corten steel sundial, and water conserving landscape throughout the site.
Silver
SANBAG - San Bernardino Associated Governments
HDR Engineering, Inc.
San Bernardino, California
Design-Bid-Build
Construction Management
Design-Build
Design-Bid-Build
Read the Case Study