The project includes the design and construction of both the Recuperative Care Center (RCC) and Residential Treatment Program (RTP) facilities. The RCC facility requires the construction of one 21,000 s.f., 2-story Type V Construction building. The RTP facility will consist of the construction of five 9,000 s.f., 2-story Type V Construction buildings.
Seeking LEED Gold certification
County of Los Angeles
GGA Architects
Downey, California
Design-Build
Construction Management
Design-Build
Design-Bid-Build
Read the Case Study