Construction of a new 53,400 SF three-story Media Arts Building for LACCD. Major components of the building include a three-story atrium space, various art studios and technology intensive multi-media studios and labs, a multi-purpose performing arts theatre with support spaces, a production studio, a recital hall, art gallery, sculpture studio, photography studio, a smart lecture hall, and faculty and staff offices and administration. Additional construction components include a service yard, concrete shade structure, storm water collection/retention and infiltration “arroyo” with drought resistant landscaping, exterior lighting, extensive site infrastructure, pedestrian walkways and partial demolition and reconstruction of an existing sunken courtyard with major retaining walls/footings.
Gold
Hartford Fire Insurance Company
Quartro Design Group
Sylmar, California
Construction Management
Design-Bid-Build
Construction Management
Design-Build
Design-Bid-Build
Read the Case Study