Construction of three new buildings totaling 50,000 SF on a three acre campus site. New buildings include a three-story classroom building, a two-story library and administration building, and a single-story multi-purpose building with kitchen and cafeteria. Scope also included a new parking garage and lunch shelter, as well as all new fire sprinkler systems.
Los Angeles Unified School District
Meyer & Allen Associates
Los Angeles, California
Design-Bid-Build
Construction Management
Design-Build
Design-Bid-Build
Read the Case Study