Multiple spur tracks were constructed as a storage and off-loading yard for incoming lumber transported by train to the facility. Several thousand feet of track were installed along with a guard house structure and road improvements. Site development included encasing and construction of a bridge over an existing 70 year old water pipeline so that new tracks could cross over without damaging the pipe.
BNSF - Burlington Northern Santa Fe Railway Company
Hanson-Wilson, Inc.
Fontana, California
Design-Bid-Build
Construction Management
Design-Build
Design-Bid-Build
Read the Case Study